KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  3-16-2014
Number of Hours:  5.00
Manual Reference:  9.3.2
Brief Description:  Clean up, prep for flanges, fill in over leg well

I got into the shop around am 8:30 and made some hard points for the side of the fuselage for the fuel and air. I then pulled off the peel-ply from yesterday and cut off the extra sticking out at the front of the stake. I cut a piece of flange that will go on the side of the fuselage for the top stake to sit on when resined into place. But first I have to fill in over the leg well before the flange goes on. After 2 cardboard templates I am now ready to cut out of my extra laminated foam board used for the baffles and bulkheads. The cut out piece was sand to fit it was bondoed into place ready for the micro and glass work. Got the glass work done and the call form above said that the dog needed a walk and fresh air so off we went. This worked out great because the resin had time to set and when we got back I told Cynthia I had a 15 minute job off peel-ply to do.
' style=

Piece fit into place

Piece fit into place

' style=

Glassed in with peel-ply

Glassed in with peel-ply

' style=

Back side done as well

Back side done as well

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.