KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  3-9-2014
Number of Hours:  2.50
Manual Reference:  9.3.2
Brief Description:  Do wheel well flange on top strake. 2

After the bondo set I lifted off the upper stake and got to work on getting it ready for the flange. I cut the bondo that squeezes trough the 1/8 gap and laid down the duct tape so the glass will release when cured. I then did the glass work for the extra I added to the circumference to have the wheel clearance. I do have lots of clearance for the wheel when it comes up into the stake. I have added a few inches in places to make up for that fuel loss.
' style=

Extra bondo cut off.

Extra bondo cut off.

' style=

Duct tape in place for release.

Duct tape in place for release.

' style=

Peel-ply on flange.

Peel-ply on flange.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.