KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  3-8-2014
Number of Hours:  2.50
Manual Reference:  9.3.2
Brief Description:  Second layer of bid cloth on bulkheads

The manual calls for one more bidirectional cloth be lay-upped on the bulkheads to help with the fuel proofing. I sanded the bulkheads and added micro in any low spots to avoid air bubbles under the glass. I then painted the bulkheads and laid down the cloth and stippled until wetted out. After 30 minuets I applied peel-ply with the heat gun for the resin to soaked trough. I did have to add some resin to the peel-ply to wet out completely a few dips of the brush was all that was needed.
' style=

Micro for the low spots

Micro for the low spots

' style=

Back reinforcement done. Now the front

Back reinforcement done. Now the front

' style=

Bulkheads with one more bid

Bulkheads with one more bid

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.