Well I got the baffle ready to be installed. It was short at both ends ¼” and 3/8” at the other end, so to speed things up I bondo a small section on and cut to length in 10 minutes sand and bondo in place. I then clean up the bondo and sand everything wipe down with acetone and start the micro mixture for the radius and bid into place. The manual said 1 bid lay-up but I did a 2 bid lay-up on this baffle as it is over the gear leg, peel-ply was added and that was it for the day.