KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  1-10-2014
Number of Hours:  2.00
Manual Reference:  9.3.4
Brief Description:  Bulkhead hard piont for fitting

It was time to install the hard point for the fuel out let so I drilled from the fuel tank side and cut out for the aluminum hard point to be floxed in place. I will be installing a second out let at the back of the fuel tank and tee them together. I see a few builders don’t do this but I will just to get every drop out of the tank if needed. I never fly with less then 1hour of fuel in my plane and after 2+ hours it's time to come down for a bathroom brake and a snack.
I cut a ¾ hole through the gear bulkhead for the fuel nut to go through to connect to the tee. I used triax one side and 2 bids on the other for strength. Tomorrow I will bid in the tube to the back of the tank
' style=

Out let hard piont floxed in

Out let hard piont floxed in

' style=

Out let at the bottom of tank

Out let at the bottom of tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.