KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  12-28-2013
Number of Hours:  6.00
Manual Reference:  9.3.2
Brief Description:  Fit more baffles and lay-ups on bulkheads.

Finished fitting baffles and it was time to glass up the fuel side of the bulkheads. Over the gear leg there is to be one more layer for strength on both sides. Had some more time in the day so I did the wing bolt hole as well.
' style=

Fuel baffles

Fuel baffles

' style=

Lay-up on fuel side of bulkheads

Lay-up on fuel side of bulkheads

' style=

Hole for wing bolts

Hole for wing bolts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.