KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  12-25-2013
Number of Hours:  4.00
Manual Reference:  9.3.1
Brief Description:  Prep top strake for wheel well flange

I got the top strake ready with lots of duct tape and placed it on for the wheel well to be bondo into place when lifted off to do the landing (flange) on the top.

Christmas was good with more tools and clothing. Zenon and Asia came home and I also did the turkey this day. I'm very happy with how things are going
' style=

Lot of duct tape for clearance.

Lot of duct tape for clearance.

' style=

Wood blocks and clamps to hold into place

Wood blocks and clamps to hold into place

' style=

Bondo wheel well to top strake

Bondo wheel well to top strake

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.