KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  2-8-2013
Number of Hours:  2.00
Manual Reference:  5.2.5
Brief Description:  2 bid on door spring hard pionts

The manual calls for one bid for this job but I used 2. The first one coved the area and 1” over the sides the second one was 2” over the sides and then used peel – ply to blend in. I just need to tap the holes now for the ball to fit.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.