Powered By Kitlog Pro v2.0
Todd's Web site
RV-8
Fuselage
8-23-2009
< Previous Log Entry
Next Log Entry >
Date:
8-23-2009
Number of Hours:
4.00
Manual Reference:
Brief Description:
Center Section #2
-Drilled and countersunk nutplate rivet holes per the plans
-Deburred the edges and holes of the bulkheads and spars where I drilled.
-Primed the 2 forward bulkhead pieces
-Installed, torqued, and torque striped 12 AN bolts to the fwd center section spar. These holes would have been used by an -8A builder.
-Riveted several nutplates per the plans
-Riveted the 2 bulkheads to the fwd center section spar.
-Clekoed the 2 aft bulkheads, seat ramp supports, and aft floor supports to the aft center section spar.
Fwd center section spar complete
Temp clekoed the fwd center section spar the floor. Starting to look like something!!!
Clekoed the aft center section spar parts together
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
470
1131
Ailerons
8
28
Building Tips
2
4
Canopy
5
10
Elevators
20
47
Empennage
5
9
Firewall Forward
1
4
Flaps
23
44
Fuselage
226
531
Miscellaneous
2
0
None
1
3
Rudder
11
23
Shop Setup
2
12
Stabs
17
39
Tools
5
9
Tribute to Jake
1
Wings
140
364
Wiring
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.