KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web site
' style=
Date:  8-15-2009
Number of Hours:  2.80
Manual Reference:  
Brief Description:  Gear Towers #11

-Final drilled the large holes for LG bolts in the bolt weldment (5/16 & 7/16 holes)

-Unclekoed the towers, deburred everything drill in the last couple sessions and primed the floor where the towers will be installed.

-Riveted the towers to the floor assembly (aft corner angles only, the forward angles will be riveted later in assembly)

-Fit and drilled the L&R Mid cabin braces, Fwd and Aft upper braces, and the throttle bracket angle IAW the instructions

-Unclekoed the parts in the previous step, final drilled the nutplate rivet holes in the mid cabin braces (then machine countersunk them) and throttle angle (then dimple countersunk them).
' style=

Aft corner angles riveted to the floor assembly

Aft corner angles riveted to the floor assembly

' style=

Everything clekoed in place

Everything clekoed in place

' style=

same

same

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.