KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web site
' style=
Date:  8-12-2009
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Gear towers #8

-Match drilled some #12 holes into the bolt weldment, removed the 4 bolts temporarily installed yesterday and deburred the newly drilled holes.

-Reinstalled the bolt weldments with all the bolts (except for 2 that will be installed when the mid cabin braces are installed)

-Installed the remaining nuts and bolts for the FWD and AFT Corner angles

-Deburred the mid cabin braces

-Taped up the one LG box weldment hole on each tower to leave open for the mid cabin brace later

-Clekoed the towers to the FWD fuselage floor assembly I put together a few weeks ago

-Started riveting the LG Box weldments to the towers (only got a few done before calling it quits, didn't figure the neighbors would like rivet gun after 2130)
' style=

Bolt weldments on the inboard, LG Box weldments on the outboard, mid-cabin braces clekoed on

Bolt weldments on the inboard, LG Box weldments on the outboard, mid-cabin braces clekoed on

' style=

Towers clekoed to floor assembly.  My feet will go between these on their way to the rudder pedals

Towers clekoed to floor assembly. My feet will go between these on their way to the rudder pedals

' style=

Just starting on riveting the LG Box weldments to the towers

Just starting on riveting the LG Box weldments to the towers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.