7-20-2009
< Previous Log Entry
Next Log Entry >
Date:
7-20-2009
Number of Hours:
4.00
Manual Reference:
Brief Description:
Forward Fuselage Floor #1
-Began assembly of the forward fuselage floor. Clecoed everything together and drilled according the plans.
-Deburred all the drilled holes
-Dimple and machine countersinked everything according the plans
-Everything is ready for edge deburring, then scuffing, priming, and assembly.
-Geez, this is fun.
Parts gathered
Everything clecoed together for drilling. This is the bottom of the floor.
Countersinking the Landing Gear Crossmembers
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
470
1131
Ailerons
8
28
Building Tips
2
4
Canopy
5
10
Elevators
20
47
Empennage
5
9
Firewall Forward
1
4
Flaps
23
44
Fuselage
226
531
Miscellaneous
2
0
None
1
3
Rudder
11
23
Shop Setup
2
12
Stabs
17
39
Tools
5
9
Tribute to Jake
1
Wings
140
364
Wiring
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.