KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web site
' style=
Date:  4-27-2010
Number of Hours:  1.80
Manual Reference:  8-17
Brief Description:  Fwd Fuselage Structure #3

- Ran a dril through the landing gear weldment rivet holes to remove the powder coating from the inside of them.
-Inserted the auxillary longerons and re-clekoed the landing gear box plate over them. The rivet centerline I drew on the longerons align perfectly in the rivet line on the box plate.
-Final drilled the nutplate attachment and rivet holes that are common between center section and mid-cabin braces.
-Un-clekoed and removed the fwd fuse sub structure from the center section bulkhead assembly
-Deburred the holes common to the center section and mid-cabin braces drilled above.
' style=

Everything in place

Everything in place

' style=




' style=

Center section removed

Center section removed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.