Finished wiring panel switches Riveted center console to dash Istalled control cables and firewall seals on all cables Fitted cabin heat cable and connected it to carb heat lever
Removed wheels and axles Drileed wheel pant brackets and painted them Mounted wheel pant brackets behind axle torqued axles to landing gear Reinstalled wheels and brakes