KitLog pro

Powered By Kitlog Pro v2.0

Tims Zodiac 601 QBK
' style=
Date:  2-12-2012
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Install engine

Finished wiring panel switches
Riveted center console to dash
Istalled control cables and firewall seals on all cables
Fitted cabin heat cable and connected it to carb heat lever

Removed wheels and axles
Drileed wheel pant brackets and painted them
Mounted wheel pant brackets behind axle
torqued axles to landing gear
Reinstalled wheels and brakes

Mounted engine with final bolts
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.