Powered By Kitlog Pro v2.0
Tims Zodiac 601 QBK
Zodiac 601
XL-B Update
8-13-2011
< Previous Log Entry
Next Log Entry >
Date:
8-13-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Drilled center spar doublers
Continued drilling center spar upgrade pieces. Made the eight vertical stiffners and assembled with clecos.
Fitted the dual stick option parts to verify that everything will fit before installing solid rivets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 601 Home
Category
# Logs
# Hours
All
55
354
Avionics
2
13
Empennage
4
22
Engine
17
118
Fuselage
14
82
Inspections
1
2
Wings
3
29
XL-B Update
14
88
Copyright © 2001-2024 Matronics. All Rights Reserved.