KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  4-15-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Rib preparation for primer

Paint prep work continues. All ribs have been throughly deburred and cleaned up with 3M maroon pads. They are now being cleaned in a dip and scrub of TSP in water followed by a rinse in fresh water. The ribs are then dryed and hung in paint booth for primer.
' style=

TSP detergent Tub and Rinse Tub

TSP detergent Tub and Rinse Tub

' style=

All ribs clean and hanging in paint booth

All ribs clean and hanging in paint booth

' style=

Heat gun to dry up all moisture from cleaning

Heat gun to dry up all moisture from cleaning

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.