I now have 7 antennas connected to the test bed. The ELT is already installed in the plane. Regulation requies is work outside of the plane's electrical system, so that's why it's not on the test bed. The 7 antennas are: COM 1, COM 2, NAV, GPS 1, GPS2, Transponder, and ADSB.