KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  8-19-2011
Number of Hours:  3.50
Manual Reference:  Aft Spar
Brief Description:  Match Drilling the Aft Spar

After I finished match drilling all of the right Aft Spar components it was time for deburring (Image 1). Then I moved onto match drilling the left Aft Spar. Image 2 shows me match drilling the left Aft Spar doublers. Image 3 shows me match drilling the left Aft Spar mid-span Aileron Doubler.
' style=

Deburring the Right Aft Spar

Deburring the Right Aft Spar

' style=

Match Drilling the Left Aft Spar

Match Drilling the Left Aft Spar

' style=

Match Drilling the Left Aft Spar Mid-Span Aileron Doubler

Match Drilling the Left Aft Spar Mid-Span Aileron Doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.