KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  5-27-2011
Number of Hours:  2.00
Manual Reference:  Lighting
Brief Description:  Preparing for Landing Lights

Once I was satisfied with the triming of the bracket I used my Vice Crip C-Clamps to position the Landing Light Support Brackets in place prior to drilling. Images 1 thru 3 show how I checked the brackets for proper alignment using a bubble level.
' style=

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

' style=

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

' style=

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

Landing Light Support Brackets Clamped in place - Checked with Bubble Level

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.