KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  5-8-2011
Number of Hours:  2.00
Manual Reference:  Lighting
Brief Description:  Preparing for Landing Lights

Image 1 shows how I use the Sharpie mark to help line up the Strut - not to worry, it will be as perfectly aligned as I can make it before I drill - my edge distance is counting on it! In Image 2 you can see that I'm Match Drilling the Strut to the Rib so the Sharpie mark must be correctly aligned now. Image 3 shows me Match Drilling the Strut to the Outboard Bracket.
' style=

Strut Clamped to Rib - Note Sharpie Mark in Tooling Hole

Strut Clamped to Rib - Note Sharpie Mark in Tooling Hole

' style=

Match Drilling the Strut to the Rib

Match Drilling the Strut to the Rib

' style=

Match Drilling the Strut to the Outboard Bracket

Match Drilling the Strut to the Outboard Bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.