KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  10-9-2010
Number of Hours:  2.00
Manual Reference:  Lighting
Brief Description:  Preparing for Landing Lights

In Image 1 you can see me deburring the recently match drilled frame parts. Image 2 shows me temporarily clecoing the frame to one of my leading edge tools and Image 3 shows me doing a trial fit of the landing light lens with the frame.
' style=

De-Burring the Rivet Holes in One of the Frames

De-Burring the Rivet Holes in One of the Frames

' style=

Lens Mounting Frame Clecoed to the Resurrected Leading Edge Form

Lens Mounting Frame Clecoed to the Resurrected Leading Edge Form

' style=

Test Fitting a Landing Light Lens to the Frames

Test Fitting a Landing Light Lens to the Frames

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.