Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
Empennage
4-5-2009
< Previous Log Entry
Next Log Entry >
Date:
4-5-2009
Number of Hours:
4.00
Manual Reference:
Section 6
Brief Description:
Preparing the Elevators
Images 1 and 2 show the elevator parts that have been prepped with Prekote.
Elevator Components Cleaned and Scotchbrited with Prekote
Elevator Components Cleaned and Scotchbrited with Prekote
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.