Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
Empennage
3-21-2009
< Previous Log Entry
Next Log Entry >
Date:
3-21-2009
Number of Hours:
2.00
Manual Reference:
Section 6
Brief Description:
Preparing the Left Elevator
The final results of the Left Elevatior tab bending can be seen in image 1.
Left Elevator Tabs Bent
Match Drilling the Trim Tab
Match Drilling the Trim Tab
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.