Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
Empennage
11-14-2008
< Previous Log Entry
Next Log Entry >
Date:
11-14-2008
Number of Hours:
1.50
Manual Reference:
Section 6
Brief Description:
Preparing the Left Elevator
Preparing the different parts that make up the Left Hand Elevator skeleton.
Fluting the Elevator Counterbalance Horn
Match Drilling the Elevator Counterbalance
Match Drilling the Elevator Lead Counterweight
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.