Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
Empennage
1-27-2008
< Previous Log Entry
Next Log Entry >
Date:
1-27-2008
Number of Hours:
2.00
Manual Reference:
Section 6
Brief Description:
Drilling the Vertical Stabilizer
Match Drilled VS-801PP skin to underlying structure. Then disassembled and deburred all holes.
Match Drilling the Vertical Stabilizer
Match Drilling the Vertical Stabilizer
Deburring the Vertical Stabilizer
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.