KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  1-27-2008
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Drilling the Vertical Stabilizer

Match Drilled VS-801PP skin to underlying structure. Then disassembled and deburred all holes.
' style=

Match Drilling the Vertical Stabilizer

Match Drilling the Vertical Stabilizer

' style=

Match Drilling the Vertical Stabilizer

Match Drilling the Vertical Stabilizer

' style=

Deburring the Vertical Stabilizer

Deburring the Vertical Stabilizer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.