Brief Description: Drilling the Vertical Stabilizer
Disassembled Vertical Stabilizer sturcture and deburred all matching holes and cleared chips. Then re-Cleco'd the Vertical Stabilizer structure together and cleco'd the VS-801PP skin in place in preparation for match drilling the skin to the structure.