KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  5-29-2011
Number of Hours:  2.00
Manual Reference:  Lighting
Brief Description:  Preparing for Landing Lights
' style=

Freshly Made Bracket Ready for Drilling

Freshly Made Bracket Ready for Drilling

' style=

Match Drilling the Longitudinal Bracket

Match Drilling the Longitudinal Bracket

' style=

Match Drilling the Similar Bracket on the Other Rib

Match Drilling the Similar Bracket on the Other Rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.