Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
All
5-29-2011
< Previous Log Entry
Next Log Entry >
Date:
5-29-2011
Number of Hours:
2.00
Manual Reference:
Lighting
Brief Description:
Preparing for Landing Lights
Freshly Made Bracket Ready for Drilling
Match Drilling the Longitudinal Bracket
Match Drilling the Similar Bracket on the Other Rib
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.