KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  6-7-2009
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Assembling the Elvators

After rolling the edges you final drill all of the holes, remove the chips generated by the drilling operation, debur the exposed holes and then re-assemble with clecos. When installing the blind rivets I would start at the middile of a section and then work my way to the ends, alternating sides.
' style=

Drilling Right Elevator Leading Edge Using 12

Drilling Right Elevator Leading Edge Using 12" Long # 40 Drill Bit

' style=

Drilling Right Elevator Leading Edge

Drilling Right Elevator Leading Edge

' style=

Squeezing Blind Rivet to Secure the Right Leading Edge

Squeezing Blind Rivet to Secure the Right Leading Edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.