KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  5-24-2009
Number of Hours:  1.00
Manual Reference:  Section 6
Brief Description:  Assembling the Elevators

Began final assembly of the Right Elevator by squeezing the rivets that hold the strap to the counterbalance arm.
' style=

Right Elevator Supported by half of the Horizontal Stabilizer Fixture

Right Elevator Supported by half of the Horizontal Stabilizer Fixture

' style=

Squeezing of Rivets on the Right Elevator Begins

Squeezing of Rivets on the Right Elevator Begins

' style=

Squeezing Continues

Squeezing Continues

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.