Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
All
5-24-2009
< Previous Log Entry
Next Log Entry >
Date:
5-24-2009
Number of Hours:
1.00
Manual Reference:
Section 6
Brief Description:
Assembling the Elevators
Began final assembly of the Right Elevator by squeezing the rivets that hold the strap to the counterbalance arm.
Right Elevator Supported by half of the Horizontal Stabilizer Fixture
Squeezing of Rivets on the Right Elevator Begins
Squeezing Continues
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.