KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  3-15-2009
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Preparing the Left Elevator

Match drilled the new Left Elevator Skin to the existing Left Elevator skeleton.
' style=

Match Drilling the New LH Elevator Skin

Match Drilling the New LH Elevator Skin

' style=

Match Drilling the New LH Elevator Skin

Match Drilling the New LH Elevator Skin

' style=

Match Drilling the New LH Elevator Skin

Match Drilling the New LH Elevator Skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.