KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  11-1-2008
Number of Hours:  1.00
Manual Reference:  Section 6
Brief Description:  Preparing the Right Elevator

Had just a few minutes to spend dimpling the outside edges of the Right Hand Elevator Skin. Used the pneumatic rivet squeezer to do it.
' style=

Using the Pneumatic Squeezer to Dimple the RH Elevator

Using the Pneumatic Squeezer to Dimple the RH Elevator

' style=

Using the Pneumatic Squeezer to Dimple the RH Elevator

Using the Pneumatic Squeezer to Dimple the RH Elevator

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.