Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
All
10-31-2008
< Previous Log Entry
Next Log Entry >
Date:
10-31-2008
Number of Hours:
2.00
Manual Reference:
Section 6
Brief Description:
Preparing the Right Elevator
Here I am match drilling the Right Elevator Spar to the Spar Doublers.
Drilling the Right Elevator Spar
Deburring - the Neverending Task...
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.