KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  10-25-2008
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Preparing the Elevators

Clecoed the Left Elevator in preparation for drilling.
' style=

Clecoing the Left Elevator

Clecoing the Left Elevator

' style=

Left Elevator Partially Clecoed

Left Elevator Partially Clecoed

' style=

Left Elevator Fully Clecoed

Left Elevator Fully Clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.