KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  1-20-2008
Number of Hours:  2.00
Manual Reference:  Section 6
Brief Description:  Drilling the Vertical Stabilizer

Prepared the VS-704 Root Rib, VS-705 Nose Rib, VS-706 Tip Rib and VS-707 Rib for assembly by fluting/straightening and deburring and then cleco'd together. Matched drilled the ribs to Spars.
' style=

Fluted VS-707 Rib

Fluted VS-707 Rib

' style=

Deburring VS-707 Rib

Deburring VS-707 Rib

' style=

Ready to Match Drill Vertical Stabilizer Structure

Ready to Match Drill Vertical Stabilizer Structure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.