KitLog pro

Powered By Kitlog Pro v2.0

The Redheads RV-7A Build SIte
' style=
Date:  2-18-2007
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Picked up 2nd Empenage Box and Inventoried parts

Picked up 2nd (larger) Empenage Box from FedEx Signal Hill. Inventoried parts with the help of my friend Dixie Branch. Photo's of the box - Kit number 73000 - and the parts layed out on a tarp spread out in my garage.

Before I can begin construction I need to order some tools and fabricate a workbench. I'll also need to do some re-arranging of my garage so I can have room for this project and still park my car inside at night.

I also want to take a EAA RV Construction Class before I start working on the real thing.
' style=

RV-7 Empenage Kit #3000

RV-7 Empenage Kit #3000

' style=

Everything looks ok in the box

Everything looks ok in the box

' style=

Parts from the small box

Parts from the small box

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.