I installed the left door and adjusted it to a good fit. I then installed the third member latch from Plane Around. I also installed the door gas cylinder brackets on each side. I applied a 1/4" bead of clear RTV between the cargo bay aft bulkhead and the overhead console. This will prevent any outside air from leaking in this area.