Brief Description: Conduit run - lightening hole preparation
The conduit passes through a lighting hole in the aft fuselage bulkhead. This area will not be accessible for inspection. I installed a 3/4" x 3/4"angle with two 3/4" WDG12 cushion clamps. The angle will be riveted onto the bulkhead before the bottom skin is installed. No spring clip caterpillar is needed here because there is 1/8" of distance between the clamp rubber and the bulkhead opening. The clamps will be fastened with AN3-3A bolts and AN365-1032 nuts.