Installed the fuel lines I had made at TSFlightlines. Because these lines are a little bigger, I increased the sice of the bushings that support the line as well as the rubber grommet that attaches to the fuselage. I did not attach the lines to the inner bulkhead so the lines could be protected during transport. I topped off the tire pressure and double checked the wheel fairing fit and brake line clearance. I did a little touch up work with high heat RTV on the bottom of the engine baffling and pro-sealed the remaining baffling on the front of the engine. Both L/R side fuselage was drilled at the wing root and the shielded fuel tank wires pushed out through bushings.