KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  12-5-2015
Number of Hours:  3.00
Manual Reference:  15.5
Brief Description:  Tail Fairing work

Short day. I removed the fairing and trimmed it along the lines marked a couple days ago. After sanding and reinstalling, I marked the leading edge and then removed the fairing. After covering the leading edge of the HS with shipping tape, I sprayed it with mold release. I mixed up a small batch of epoxy/flox and applied it to the leading edge radius of the fairing. I reinstalled the fairing and filled the small gap between the fairing and leading edge. All for today. Once that cures, I will sand it to match my original cut lines. The gap is now filled with structural epoxy/flox.
' style=

Fairing fit leading edge

Fairing fit leading edge

' style=

Prep fairing for epoxy

Prep fairing for epoxy

' style=

Micro balloons installed on leading edge

Micro balloons installed on leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.