KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  10-16-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Door cylinder bracket / insulation

Finished cutting in the insulation around the L/R air inlet and forward C channel. Next I installed the L/R door cylinder brackets. Then the lower cowling was removed and the bump which came close to fowling the mixture arm was sanded smooth and re- epoxied. I also trimmed the vertical muffler hanger on the left exhaust. Ended the day by recharging the desiccant plugs
' style=

Fuselage insulation

Fuselage insulation

' style=

Door cylinder bracket install

Door cylinder bracket install

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.