KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  10-20-2015
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Cowling prep for paint

Prepped the doors so Jim could prime the outside. I found that by using a 5/16" punch on the tape and filling the screw holes before paint saved lots of work later...but does take time. PTI high build primer...8 oz fluid, weighed 9.5oz. I worked on the cowling a little more. I have an 1/16" overbite on the left side and a 1/16" underbite on the right. I am using micro to fairing it out. I plan to have Jim shoot the cowling next Tuesday.
' style=

covering screw holes

covering screw holes

' style=

Micro fill overbite/underbite

Micro fill overbite/underbite

' style=

My painter (Jim)

My painter (Jim)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.