KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  11-5-2015
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Mixture arm reset/reflective material install

I moved the mixture lever one click due to cowling interference. After readjustment, Kris worked the mixture control and I watched the action. Now I have 1/4" clearance and great action. I removed the lower cowling and applied the Vans engine compartment heat foil. I had originally ordered 6', but ran short, so I ordered 3' more. I also ordered their cowling plugs. When all the foil is applied, I will seal all the joints by brushing on epoxy.
' style=

Reflective material install

Reflective material install

' style=

Reflective material short 1 piece

Reflective material short 1 piece

' style=

Lower cowling fit up

Lower cowling fit up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.