KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  5-30-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cargo bay door wiring

The left wing root CPC socket connectors for the aileron trim came today and was installed. Both wing root CPCs are complete. I had to reroute my cargo bay light switch wire and door annunciator wire so the aft side panels could be installed. I just added a few bushings and rerouted clear of the panel. I also reinstalled the boost pump assembly into the tunnel. Tightening the nut seated the o-ring and it held 30 lbs for the 24 hour test. I decided to have a flexible fuel line made for the connection from pump to firewall in the tunnel. I called Tom at TSFlight lines....and need to follow up Monday. Once I get his hose assembly installed, I will rerun the fuel line pressure test. I did not use the Vans supplied bushings for the side walls. I used one two sizes larger so if I need to disassemble, the wire and Molex pins will go through just fine.
' style=

Routing cargo switch wire

Routing cargo switch wire

' style=

Door switch bushing

Door switch bushing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.