KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  6-30-2015
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Air vents

I fit the forward side panels to the NACA vents and then drilled/sized them for the Vans vents. Next they were painted 3x with GM trim black. Once dry, I used pro-seal to attach them into their final position. Unlike the rear, I used three clecos to secure them until the pro-seal cures. I plan to just fill the holes with fiberglass in a week or so. Next I cut the insulation for the area around the rear side vents. I used 1/4" SoundEX in the center where I needed the clearance and tied it all together with aluminum tape.
' style=

Wall side foam contour

Wall side foam contour

' style=

Setting NACA ducts

Setting NACA ducts

' style=

Inside Duct all painted

Inside Duct all painted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.