KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  4-24-2015
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Battery and pitch autopilot

I removed the prime paint around each fastener and alodined to protect it. I alodined the ground angle and battery hold down angle I manufactured. After applying some dielectric grease to the mating surfaces, I bolted it together. I then installed the ground angle after applying more dielectric grease. I installed the battery and wired the battery to the ground along with the #2 wire coming from the panel. After installing the hold down support, I installed the Garmin autopilot servo motor.
' style=

Battery ground install

Battery ground install

' style=

Battery install

Battery install

' style=

Garmin Autopilot installed (pitch)

Garmin Autopilot installed (pitch)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.