KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  5-3-2015
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Control Stick D-Sub pins/sockets

Finished the pilot side D Sub today. Kris played pilot moving the control stick switches as I used a meter to check pin outs. Next, I installed both stick harnesses and installed the back-shells, pins, CPC. I called on Kris again to articulate the switches as I used a meter to check pin outs. All the wires were in their proper place. I am amazed how great the pins and sockets install with the Daniels tool. I see why it is so expensive now.
' style=

Control stick D-Sub pins

Control stick D-Sub pins

' style=

Control stick D-Sub sockets

Control stick D-Sub sockets

' style=

D-Sub pinned ready for backshell

D-Sub pinned ready for backshell

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.