KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  4-9-2015
Number of Hours:  8.00
Manual Reference:  
Brief Description:  EGTs and GHTs Install

I finished the EGTs and CHTs wiring on the left side and made some final adjustments to the throttle cable. I asked my friend Larry (A&P) to stop by and review my firewall forward. Larry recommended that I wrap the cross member with protective tape where the cables cross to protect it. He also suggested that I add a tie-wrap to my right heat cable to stand it off from the firewall. While he was here he double checked the control cable functionality and safetied the prop governor. I installed the oil cooler SCAT and checked all for clearances. The single conductor shielded #18 arrived today so I wired the start terminal on the start relay back through the firewall. It will be connected to P1-6. I also ran the left mag wire back which will also be connected to P1-17/18. I will start there tomorrow.
' style=

Left EGT/CHT

Left EGT/CHT

' style=

Prop governor adjusted/safty wired

Prop governor adjusted/safty wired

' style=

Oil cooler SCAT installed

Oil cooler SCAT installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.