KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  11-19-2014
Number of Hours:  6.00
Manual Reference:  47.10
Brief Description:  Oil service door

Placed and drilled the oil service access door on the cowling. Clecoed in place, I traced around the opening and epoxied 1/4" foam to the backside. i then covered the entire door with one layer of BID fiberglass and clamped it together until it cures. The RV10 oil door has a slight curve in its design, so to maintain that curve, I used the cowling cutout when I installed the clamps
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.