I temporally mounted the fuel injector throttle body and cable bracket. I will remove these later when I drain the rest of the preservation oil. Once installed, I assembled the mixture cable and attached it to the bracket. The mixture arm had to be indexed to facilitate movement. The arm was indexed, adjusted and torqued. I then added the top of the air cleaner box and reinstalled the lower cowling to check for proper alignment. I used a plumb bob as an initial set up, but the final setting will be aligned with the cowling opening.