FF2-4 (revision 0) figure 1 calls for AN470AD4-5 to secure bracket CB1004C...should say AN470AD4-4. After bending over a couple in my squeezer, I decided to measure the rivet length required. Yep, they were in error. I replaced the ones I installed with the correct length. With over 400 RV10s flying, you would think someone noticed and reported it. I used the fly cutter again to cut the 2" air hole on the right aft baffle and sandwiched a bug screen between the baffle and duct before I riveted it in place. At the end of the day I had the left and right aft sub sections riveted together and a few of the enter sections were fitted and drying after their alodine bath.